1 00:00:04,630 --> 00:00:02,470 the robotics officer in mission control 2 00:00:07,749 --> 00:00:04,640 and the mechanical systems officer here 3 00:00:10,150 --> 00:00:07,759 in mission control will provide a report 4 00:00:12,870 --> 00:00:10,160 to flight director zeb scoville 5 00:00:13,990 --> 00:00:12,880 as to how we're progressing as we move 6 00:00:15,749 --> 00:00:14,000 into the home stretch of the 7 00:00:18,150 --> 00:00:15,759 installation procedure 8 00:00:20,470 --> 00:00:18,160 that is going to provide a 9 00:00:22,630 --> 00:00:20,480 ready-to-latch indication on three 10 00:00:24,630 --> 00:00:22,640 ready-to-latch sensors 11 00:00:27,349 --> 00:00:24,640 at that common berthing mechanism 12 00:00:29,349 --> 00:00:27,359 interface at that point 13 00:00:32,470 --> 00:00:29,359 dragon will be ready to be bolted into 14 00:00:35,590 --> 00:00:32,480 place again there are four gangs of four 15 00:00:38,069 --> 00:00:35,600 bolts apiece 16 bolts in all that will 16 00:00:40,869 --> 00:00:38,079 firmly lock dragon to the earth-facing 17 00:00:43,510 --> 00:00:40,879 port of harmony and provide an 18 00:00:46,229 --> 00:00:43,520 opportunity thereafter for 19 00:00:48,150 --> 00:00:46,239 the crew to provide leak checks inside 20 00:00:49,830 --> 00:00:48,160 the space station to make sure we have 21 00:00:50,869 --> 00:00:49,840 an airtight seal 22 00:00:53,270 --> 00:00:50,879 before 23 00:02:00,550 --> 00:00:53,280 work continues to open the hatch to 24 00:02:04,550 --> 00:02:02,870 this is mission control houston the 25 00:02:07,109 --> 00:02:04,560 mechanical systems officer here in 26 00:02:08,550 --> 00:02:07,119 mission control has now confirmed second 27 00:02:11,910 --> 00:02:08,560 stage capture 28 00:02:13,990 --> 00:02:11,920 dragon is now bolted into place on the 29 00:02:16,150 --> 00:02:14,000 earth-facing side of the harmony module